Breakbulk and Project Cargo from China
Where a unit is too tall, too wide or too heavy for a container, and too large for a RoRo ramp, it moves as breakbulk: lifted by crane or rolled onto a general cargo vessel and lashed to the deck or stowed in the hold.
Out-of-gaugeMining trucks · excavators · cranesLashing plan required
Stowage
Stowage Operations




Cargo
Typical Breakbulk Cargo
- Mining dump trucks and articulated haulers
- Excavators, bulldozers, wheel loaders, graders
- Mobile cranes and drilling rigs
- Oversize or articulated buses
- Boats, yachts and heavy industrial skids
- Steel structures and plant modules
What we need from you to quote
- Length, width, height in transport position
- Gross weight and, for machines, the axle loads
- Centre of gravity and lifting points if known
- Photographs from all four sides
- Whether the unit rolls under its own power
- Origin address and destination port
Method
Loading and Securing Methods
| Method | Used when | Requirement |
|---|---|---|
| Crane lift on/off (Lo-Lo) | Unit is too tall or heavy for a ramp | Crane capacity at both load and discharge port |
| Roll-on by ramp | Self-propelled machinery on a suitable ramp | Ramp angle and deck strength must suit the axle load |
| Skidding or SPMT | Very heavy modules at specialised terminals | Terminal engineering approval, booked in advance |
| On flat rack then lifted | Unit fits a rack and the ship can lift it | Flat rack lashing plan, rack positioning fee |
Lashing and securing on breakbulk is done by the terminal stevedores to the vessel standard and is charged separately from freight. It is not optional and it is not negotiable — a poorly lashed unit does not sail.
Basis
Freight Calculation: Revenue Ton Basis
Breakbulk freight is quoted on a revenue ton basis: the greater of the weight in tonnes and the measurement in cubic metres. Heavy machinery bills on weight; large but light cargo bills on volume.
| Component | What it covers | Billed by |
|---|---|---|
| Ocean freight | Carriage on the vessel | Revenue ton or lump sum |
| Lashing and securing | Timber, wire, welding to deck, stevedore labour | Per unit or per revenue ton |
| Terminal handling | Receiving, storage before loading, crane hire | Per unit or per ton |
| Documentation | Bill of lading, manifest, certificates | Per shipment |
| Port and agency fees | Agency, port dues, tug and pilot where applicable | Per shipment |
The figure that matters is the total door-to-ship cost, not the freight rate alone. We quote all components separately so you can see what you are paying for.
Risk
Pre-Shipment Survey and Condition Record
- Pre-loading survey with photographs from all sides
- Existing damage recorded and countersigned by the terminal
- Lashing inspected before the hatch is closed or the ship sails
- Discharge survey available on request at destination
Send dimensions, weight and photographs for a Breakbulk Quotation
Breakbulk is quoted per shipment. There is no rate card that survives contact with a real machine.
Request a QuoteQuestions we get asked often
What counts as out-of-gauge?
Any unit that exceeds the internal dimensions of the container it would otherwise travel in, or that exceeds the vessel deck or ramp limits. In practice: most mining trucks, large excavators and anything over about 2.7 m high.
Can a mining dump truck travel in a container?
Rarely. They exceed container height and often width. Some can travel dismantled on flat racks — cab, body and chassis separated — but reassembly at destination is a real cost that must be weighed against breakbulk.
Why is lashing quoted separately?
Because it is done by the terminal, priced by the work involved, and varies with the unit. Carriers will not accept a vessel sailing with unsecured heavy cargo.
Do you handle the export declaration for project cargo?
Yes, for shipments we book. Classification of used machinery and vehicles has its own requirements; we handle it and tell you what documentation the commodity needs.
How far ahead should I book?
Earlier than a container booking. Breakbulk space and crane slots are limited and the terminal needs the lashing plan in advance. Ask us as soon as the sale is agreed.